CITIC Telecom CPC Baltic• 2 landing points
Status Legend
Operational
Fault
Degraded
Maintenance
Landing Station
Uptime & Statistics
95.00%
12-Month Uptime
1
Total Reports
1
Confirmed
Fault
Current Status
350 km
Length
8 Tbps
Capacity
2
Landing Points
Ownership
CITIC Telecom CPCPrimary
100.00%
Landing Points (2)
1
Tallinn CLS
Tallinn, EE
operational
2
Stockholm CLS
Stockholm, SE
operational
2 landing points connected
350 km total length
Recent Events
Estonia-Sweden segment severed on December 28, 2024. Suspected sabotage/hybrid warfare during Baltic Sea incidents. Investigation ongoing. Full outage - 100% capacity affected.